Suche mittels Attribut

Zur Navigation springen Zur Suche springen

Diese Seite stellt eine einfache Suchoberfläche zum Finden von Objekten bereit, die ein Attribut mit einem bestimmten Datenwert enthalten. Andere verfügbare Suchoberflächen sind die Attributsuche sowie der Abfragengenerator.

Suche mittels Attribut

Eine Liste aller Seiten, die das Attribut „Zusammenfassung“ mit dem Wert „We are developing a refuelable zinc/air battery (6-cells) for evaluation under the five USABC “core” test protocols. In the first half of the two year project ($100K, FY1997), an advanced refuelable design was developed, fabricated and tested at power levels up to 415 W. . Performance matched or exceeded that of earlier multicell systems. A computer program was developed for automated data acquisition and drive cycle simulation. Small mockup cells (80 cm2) were constructed for rapid testing of components. In the follow-on effort (FY1998, $100K) we will make minor advances in system design and fabrication efficiency, and seek to improve cathode performance and life, before delivery of two final units for test at DOE laboratory.“ haben. Weil nur wenige Ergebnisse gefunden wurden, werden auch ähnliche Werte aufgelistet.

Hier sind 2 Ergebnisse, beginnend mit Nummer 1.

Zeige (vorherige 50 | nächste 50) (20 | 50 | 100 | 250 | 500)


    

Liste der Ergebnisse

    • Cooper et al. 1998  + (We are developing a refuelable zinc/air baWe are developing a refuelable zinc/air battery (6-cells) for evaluation under the five USABC “core” test protocols. In the first half of the two year project ($100K, FY1997), an advanced refuelable design was developed, fabricated and tested at power levels up to 415 W. . Performance matched or exceeded that of earlier multicell systems. A computer program was developed for automated data acquisition and drive cycle simulation. Small mockup cells (80 cm2) were constructed for rapid testing of components. In the follow-on effort (FY1998, $100K) we will make minor advances in system design and fabrication efficiency, and seek to improve cathode performance and life, before delivery of two final units for test at DOE laboratory.wo final units for test at DOE laboratory.)